When you engage us for demolition services—whether for an old structure, concrete slab, asphalt surface, or site cleanup—our goal is to execute the project with precision, safety, and minimal disruption to your property or business operations. Here’s how Camelback Paving, Inc. manages each demolition job from initial evaluation through final site restoration.
Our process begins with a thorough on-site consultation. A project manager visits your location to assess the demolition scope, materials involved, potential hazards, and access points. We document site logistics, utilities, and safety constraints, preparing a detailed plan and schedule while explaining permitting, environmental, and recycling requirements.
Once the scope is defined, our team develops a comprehensive plan including work-zone setup, scheduling, safety protocols, and debris logistics. We handle all required permits in Phoenix, ensure regulatory compliance, and prepare for material recycling or disposal, dust mitigation, and noise control for a smooth, safe operation.
Before equipment engages, we secure the site with fencing, signage, and traffic controls. Utilities are disconnected, dust control is applied, and protective barriers are installed for structures or landscaping that must remain intact. Safety is our top priority, ensuring a clean and organized start to demolition.
With preparation complete, we begin the controlled removal of materials. Depending on the project, this may include breaking and removing concrete, asphalt, or structural elements. We manage dust, noise, and debris flow while maintaining communication and separating recyclable materials for responsible disposal.
After demolition, we clear all debris from the site. Recyclable materials such as concrete, asphalt, and metal are separated and delivered to approved recycling facilities. We sweep, clean, and restore the area to a safe, orderly condition ready for the next phase of development or paving.
We conduct a final walkthrough to confirm completion and site readiness. Clients receive documentation of materials removed and recycled. Our team remains available for follow-up questions or coordination with paving contractors. At Camelback Paving, we stand behind every job with professionalism and long-term support.
Yes. We coordinate with local authorities to secure all required demolition permits, ensure utilities are disconnected, and handle waste disposal according to local and state regulations.
Timeframes vary by size, materials, and access. Small pad removals may take a day, while large structures could take days to weeks. We provide a precise estimate during planning.
We sort and haul away all debris. Recyclable materials such as concrete, asphalt, and metal are delivered to recycling facilities, while non-recyclables are properly disposed of.
Absolutely. Preparation includes identifying what must remain intact and installing barriers, coverings, and clearance buffers to protect buildings, trees, and landscaping.
Yes. We deliver the site in a clean, stable condition ready for paving, construction, or landscaping. We can also coordinate with your paving contractor to ensure proper preparation.